no code implementations • 18 Dec 2018 • Karan Aggarwal, Onur Atan, Ahmed Farahat, Chi Zhang, Kosta Ristovski, Chetan Gupta
Classically, this problem has been posed in two different ways which are typically solved independently: (1) Remaining useful life (RUL) estimation as a long-term prediction task to estimate how much time is left in the useful life of the equipment and (2) Failure prediction (FP) as a short-term prediction task to assess the probability of a failure within a pre-specified time window.