no code implementations • 21 Nov 2020 • N. Safari, S. M. Mazhari, C. Y. Chung, S. B. Ko
Accurate short-term prediction of overhead line (OHL) transmission ampacity can directly affect the efficiency of power system operation and planning.
no code implementations • 3 Aug 2020 • O. A. Ansari, S. M. Mazhari, Y. Gong, C. Y. Chung
Moreover, further simulation results indicate the impacts of uncertainties of wind generation and load demand on short-term reliability indices.
no code implementations • 30 Apr 2018 • M. Dong, P. C. M. Meira, W. Xu, C. Y. Chung
The data collected by smart meters contain a lot of useful information.
no code implementations • 24 Sep 2017 • Junpeng Zhan, Osama Aslam Ansari, C. Y. Chung
The accuracy of the proposed cavern model is verified via comparison with an accurate non-linear model.
no code implementations • 24 Sep 2017 • Junpeng Zhan, Yunfeng Wen, Osama Aslam Ansari, C. Y. Chung
A modified RTS-79 system is used to verify the effectiveness of the whole model and the solution methodology.