no code implementations • 26 Feb 2024 • Baris Donmez, Gunes Karabulut Kurt
It is found that an equidistant triple satellite scheme on EMLP-2 halo orbit with a semi-major axis length of 15, 000 km provides full SCP for LFS and it is essential for the continuous LFS wireless power transmission.
no code implementations • 8 Jun 2023 • Baris Donmez, Irfan Azam, Gunes Karabulut Kurt
Our simulation results show that in the non-ATP case, the minimum required average harvested power cannot be achieved beyond 680 and 1360 km distances for 1U and 12U satellites, respectively, with a maximum transmit power of 1 kW.