A (1+epsilon)-Approximation for Makespan Scheduling with Precedence Constraints using LP Hierarchies

16 Feb 2018  ·  Levey Elaine, Rothvoss Thomas ·

In a classical problem in scheduling, one has $n$ unit size jobs with a precedence order and the goal is to find a schedule of those jobs on $m$ identical machines as to minimize the makespan. It is one of the remaining four open problems from the book of Garey & Johnson whether or not this problem is $\mathbf{NP}$-hard for $m=3$. We prove that for any fixed $\varepsilon$ and $m$, an LP-hierarchy lift of the time-indexed LP with a slightly super poly-logarithmic number of $r = (\log(n))^{\Theta(\log \log n)}$ rounds provides a $(1 + \varepsilon)$-approximation. For example Sherali-Adams suffices as hierarchy. This implies an algorithm that yields a $(1+\varepsilon)$-approximation in time $n^{O(r)}$. The previously best approximation algorithms guarantee a $2 - \frac{7}{3m+1}$-approximation in polynomial time for $m \geq 4$ and $\frac{4}{3}$ for $m=3$. Our algorithm is based on a recursive scheduling approach where in each step we reduce the correlation in form of long chains. Our method adds to the rather short list of examples where hierarchies are actually useful to obtain better approximation algorithms.

PDF Abstract
No code implementations yet. Submit your code now

Categories


Data Structures and Algorithms Discrete Mathematics

Datasets


  Add Datasets introduced or used in this paper